Pierce Atwood has handled thousands of matters in its 130-year history. If you know what you’re looking for, feel free to use the keyword search field above. If you know the attorney or area of expertise most relevant to your needs, use the drop down menus. Or, if your search is not that specific at this point, select a practice area that is most relevant to your interests.
The $1.5 billion Maine Power Reliability Program was the largest transmission project in Maine's history, with approximately 350 miles of new high voltage transmission line and five new substations. Pierce Atwood was instrumental in helping CMP assess the need for the project through the ISO-New England regional transmission planning process, overseeing the studies to develop the transmission solution for that need, preparing the non-transmission alternative assessment for the project, and obtaining all federal, state, and municipal environmental and land use permits for the project.
Pierce Atwood represented Great Bay Renewables in connection with its acquisition of an existing royalty agreement on a portion of an operating wind project from Apex Clean Energy for $18 million. The project, which achieved commercial operations in September 2022, is an approximately 1 GW wind project located in Hansford County, Texas owned and operated by a top-tier renewables owner-operator.
Pierce Atwood represents project developer Plus Power in connection with the financing, land use, environmental mitigation and siting of a 150 MW / 300 MWh battery storage facility in Carver, Massachusetts. Cranberry Point Energy Storage is the largest battery storage project under construction in Massachusetts.
We represent the project developer before the Massachusetts Department of Public Utilities and the Massachusetts Environmental Policy Act Office (MEPA) for approval to construct and operate a 250 MW lithium-ion battery facility and a 345 kV transmission line.
Pierce Atwood serves as lead transactional and environmental counsel for a leading U.S. operator and developer of stand-alone, utility-scale battery energy storage systems, in connection with a proposed 700±-MW battery energy storage system in Everett, Massachusetts. When completed, the proposed storage facility will be one of the largest in Massachusetts and will occupy a critical, urban location given its proximity to the Mystic substation. Pierce Atwood also leads aspects of the complex, state environmental permitting efforts, including, but not limited to, permitting under the Massachusetts Public Waterfront Act, known as Chapter 91, and the Massachusetts Environmental Policy Act.
Pierce Atwood acted as real estate and environmental permitting counsel for Calpine Corporation in its $530 million acquisition of the 809 MW Fore River Generating Station in North Weymouth, Massachusetts from Exelon Corporation in 2014. Pierce Atwood attorneys from the Real Estate, Energy, Environmental and State and Local Tax practice groups worked seamlessly to analyze and resolve the many complex land use, tax, and environmental issues. The initial bid preparation through purchase agreement negotiation was accomplished in 15 weeks. Our work included analysis and management of complex tidelands, former coal ash disposal, dual fuel delivery requirement, and management of active MassHighway bridge relocation through the center of project site.
Pierce Atwood represented Great Bay Renewables in the provision of capital to support interconnection deposits for multiple renewable energy developers for projects in the Midcontinent Independent System Operator (MISO) 2022 interconnection cycle.
With our partners from Central and Eastern Europe, our Energy attorneys are leading a legal review of sector policies addressing climate change and promoting the transition to low carbon economies.
We successfully defended Central Maine Power Company’s standards for planning local transmission systems before the Maine Public Utilities Commission (PUC). In a year-long investigation into the appropriate standards for Maine’s electric utilities to use in planning their local transmission systems, we defended the standards that CMP has historically followed. The PUC Staff rejected most of CMP’s planning standards as unreasonable, but the Commission largely rejected the Staff’s view and affirmed that CMP’s planning standards reflect good utility practice, are reasonable and will help ensure that CMP’s customers have a safe and reliable transmission system. CMP is pleased with this outcome as it vindicates the Company’s position and will hopefully bring certainty to the planning of future transmission projects in Maine.
Pierce Atwood represented Consolidated Communications Holdings, Inc. in obtaining approval from the Maine Public Utilities Commission of Consolidated’s acquisition of FairPoint Communications, Inc. The all-stock transaction was valued at approximately $1.3 billion including debt and based on present equity value.