Long Creek Watershed Stormwater Compliance

Represented multiple large landowners in the Maine Mall area of Portland and South Portland with regard to new stormwater permitting requirements resulting from a Residual Designation Authority (RDA) determination by EPA. The RDA requires permits for every parcel of land in the Long Creek Watershed with one acre or more of impervious surface. This RDA determination is one of only four in the country.