Favorable Settlement in Seven-Party Mediation

Obtained a favorable settlement for an owner of a spiritual retreat facility against its contractor and design professionals through a seven-party mediation following an incident that involved a burst sprinkler pipe, substantial property damage, and discovery of pervasive latent construction defects. Before the mediation, Pierce Atwood worked closely with the owner and the owner’s representatives to review the defective conditions and press for performance of the remedial work by the construction and design professionals.  Multiple demands on the contractor’s performance bond had to be made to ensure performance of the corrective and incomplete work.  Once the work was completed, Pierce Atwood represented the owner in the multi-party mediation that dealt with challenging issues involving construction defects with the fire protection system, reimbursement for additional costs due to the delayed project, complex insurance coverage issues (including with the owner’s property insurer), contract terms (waiver of subrogation, waiver of consequential damages), continuing warranty obligations, and the scope and finality of the release. At the end of the mediation process, the owner was paid for costs it incurred during the delayed project and it paid nothing against the claims submitted by its contractor and design professionals.